Flow
4 core stages/
PROGRAM / 03
Factory readiness
Manufacturing control before scale.
Body, battery, final assembly and end-of-line validation operate as one traceable production flow.
Control
Quality gatesRamp
Low volume first01
Production flow
From body to verified vehicle
Every handoff across structure, pack integration, final assembly and end-of-line test has clear ownership.
- Body joining and dimensional control
- Battery pack, BMS and thermal integration
- Drive unit, interior, flashing and calibration
- Charging, ADAS, NVH and final verification
02
Smart factory
Automation where it improves evidence
Robotics, vision inspection, torque traceability and digital work instructions improve repeatability and learning.
03
Ramp logic
Prove the line before expanding it
A low-volume launch line establishes process capability, supplier performance and field reliability before major capacity commitments.