PROGRAM / 03

Factory readiness

Manufacturing control before scale.

Body, battery, final assembly and end-of-line validation operate as one traceable production flow.

Flow

4 core stages

Control

Quality gates

Ramp

Low volume first
01

Production flow

From body to verified vehicle

Every handoff across structure, pack integration, final assembly and end-of-line test has clear ownership.

  • Body joining and dimensional control
  • Battery pack, BMS and thermal integration
  • Drive unit, interior, flashing and calibration
  • Charging, ADAS, NVH and final verification
02

Smart factory

Automation where it improves evidence

Robotics, vision inspection, torque traceability and digital work instructions improve repeatability and learning.

03

Ramp logic

Prove the line before expanding it

A low-volume launch line establishes process capability, supplier performance and field reliability before major capacity commitments.

Next / 04Battery & powertrain